Hull STW – Heat Exchangers

HULL STW Design, manufacture and supply four 900kW heat exchangers to maintain digester temperature at Yorkshire Water site, Hull STW. What we did Project Scope Biogas Products Ltd were contracted to design and manufacture 4no hot water to sludge tube/shell heat...

Hull STW – Membrane Gas Holders

HULL WWTW Design, manufacture and install two new 1500m3 membrane gas holders on Yorkshire Water site at Hull WwTW. What we did Project Scope Biogas Products Ltd were contracted to supply and install 2no 1500m3 PVC membrane gas holders to replace existing gas holders...

Membrane gas Holder – Oldham WwTW

OLDHAM WWTW Design, manufacture and install a new membrane 3000m3 gas holder on United Utilities site at Oldham WwTW. What we did Project Scope Biogas Products Ltd were contracted to supply and install a 3000m3 PVC membrane gas holder to replace an existing steel...

Digester refurbishment Liverpool WwTW

Digester Refurbishment, Liverpool WwTW, UK Client: Eric Wright Ltd (United Utilities) Project summary: Refurbish and replace mechanical plant Project Scope Biogas Products Ltd were contracted to refurbish roof-mounted mechanical equipment on top of an anaerobic...

Gas Boosters and Pipework, Oldham WwTW

Gas boosters and pipework Client: Nomenca Ltd Project summary: Relocate gas boosters and install new pipework Project Scope Biogas Products Ltd were contracted to relocate existing CHP gas boosters to a location adjacent to the new Gas Holder. This included the...