by biogaspr18 | Oct 2, 2020
COLONY FARM Design, manufacture and install a new rectangular membrane 5000m3 gas holder on Colony Farm in Cambridgeshire, UK. What we did Project Scope Biogas Products Ltd were contracted to supply and install 1no rectangular gas holder to be fitted onto the concrete...
by biogaspr18 | Jul 8, 2020
H2S SCRUBBER Supply a low-pressure H2S media scrubber to completely remove 250ppm of H2S from a biogas flow of 110m3/hr using Biobond media. What we did Project Scope Biogas Products Ltd were contracted to design and manufacture a low-pressure biogas scrubber...
by biogaspr18 | Sep 13, 2018
Biomethane, Newton Aycliffe, UK Client: Emerald Biogas / CNG Services Project summary: Manufacture and install tube shell heat exchanger Project Scope To provide a system to raise and maintain a constant biomethane temperature before injection into the grid network....
by biogaspr18 | Sep 13, 2018
Biogas Cooling System, Lincs, UK Client: AEL Biogas Project summary: Manufacture and install tube shell heat exchanger Project Scope The existing gas cooling system installed was not working efficiently and the Client was experiencing major problems with the CHP...
by biogaspr18 | Aug 30, 2018
Rectangular Biogas Holder, UK Client: Rose Hill Farm, Gloucestershire Project summary: Supply and install rectangle biogas holder onto existing digester Project Scope To supply a pvc membrane rectangular biogas holder on an existing digester site to increase gas...