Recent Installations

![]()
Client - Coca Cola
Site - Coca Cola, Wakefield Plant
The existing membrane gas holder had reached the end of its working life. Biogas Products repaired the gas holder to provide further extended service while a replacement was procured. The original UPVc gas pipework system was also found to be in poor condition. A new stainless steel system was designed, fabricated and installed..
Equipment supplied:-
1x 12m³ capacity 3 membrane gas holder
1x Stainless steel gas utilisation pipework system